Skip to content

Electrical panel replacement

An old fuse box replaced with a modern panel and RCDs. Documentation included.

Technician with a tool belt and cables in a kitchen

A new panel is needed when you add an induction hob, an EV charger or underfloor heating. Your supply capacity is assessed and a setup proposed that will be enough in the future too.

Included in the price

  • Panel design and components
  • RCDs for wet rooms
  • Cable labelling
  • Test report and as-built drawing

Questions

How long will I be without power?

Replacing an apartment panel usually takes 4–6 hours. By agreement the work can be done during the day while you are at work.

Tell us what you need.

We help find the right solution and prepare a quote. The contractor and contracting party are specified in the quote or contract.

+372 5340 2417